Structural engineering for managing agents, housing providers and landlords
Inspections, monitoring and repair specifications for blocks of flats and mixed-use buildings, with fixed fees, plain-English reports and clear priorities.
What we do for blocks and portfolios
We inspect and report on the structure of blocks of flats, mixed-use buildings and rented homes, and specify repairs so contractors price the same work. Every inspection report is signed off by a chartered engineer (CEng MICE) and sets out what was found, how urgent it is and what to do next, in language residents and boards can follow.
| Service | Use it when | From (+ VAT) |
|---|---|---|
| Structural safety review for blocks | A planned check of a block, or after an incident | £600 |
| Balcony and walkway inspection | Rust staining, spalling concrete, loose railings, cracked stairs | £500 |
| RAAC identification and assessment | Flat roofs or floors from the 1950s to mid-1990s | £600 |
| Drone roof and facade inspection | High elevations and roofs without scaffolding | £300 |
| Crack monitoring | Cracking where you need to know if it is still moving | £450 |
| Dangerous structure inspection | Something may fall or collapse | £450 |
| Fire, flood or impact damage assessment | After a fire, flood or vehicle impact | £600 |
| Wall tie condition survey | Horizontal cracks in cavity walls | £250 |
| Remedial works design and specification | Repairs that contractors must price to the same scope | £650 |
| Schedule of works and tender package | Major works going out to tender | £1,000 |
| Repair cost estimate | Budgeting and reserve-fund planning | £500 |
| Floor loading assessment | A commercial tenant wants heavy equipment or racking | £450 |
Situations we are asked about most
- A resident reports new cracks in a stairwell, landing or flat
- Concrete balconies or walkways with rust staining or pieces falling
- Loose render or cracking on the outside of the block
- An insurer, lender or board asks whether RAAC is present
- A leaseholder wants to remove a wall or chimney breast and needs a licence to alter
- A commercial tenant on the ground floor wants to add heavy equipment, racking or a mezzanine
- Damage after a fire, flood, leak or vehicle impact
- Major works that need a specification for tender and consultation
Quick answers to many of these are on our blocks and commercial questions page.
Licence to alter: reviewing leaseholders' structural proposals
When a leaseholder plans structural work, we review their engineer's calculations and drawings on the freeholder's behalf. We tell you plainly whether the proposal is adequate, what is missing and what conditions to attach, so you can grant consent with confidence. See structural design appraisal and Part A compliance statements from £300.
How an instruction works
- Tell us about the building and the concern. We reply within 2 working hours on working days.
- Fixed fee in writing. Per building or for a portfolio, agreed before any work starts.
- Inspection. Usually within 48 hours, sooner if something looks unsafe.
- Report. Within 5 working days of the visit, with photos, priorities and next steps. Faster service is available for an extra fee.
- Repairs. If needed, we specify them, help with tender and inspect the work.
What to send us
- The building address or addresses
- Number of storeys and flats, and the approximate age and construction if known
- What prompted the request: a planned review, a resident's report, an insurer or an incident
- Any previous structural reports, drawings or photos
- Who arranges access to flats, roofs and plant areas, and any deadline
Email info@greencodeengineering.com, WhatsApp 07501 130426 or use the enquiry form.
Frequently asked questions
How often should a block of flats have a structural inspection?
For most blocks there is no single fixed legal interval. Many managing agents schedule a structural review every few years and after any incident, with exposed balconies and walkways checked more often. Our report recommends a frequency for each building based on its condition.
Can you review a leaseholder's plans to remove a wall?
Yes. We check the leaseholder's structural calculations and drawings on the freeholder's behalf and tell you whether they are adequate, or what is missing, before you grant a licence to alter.
Can your specification be used for section 20 consultation?
Yes. Our schedules of works and tender packages set out the scope so contractors price the same work, which is what a section 20 consultation needs.
Do you work across several buildings?
Yes. We can quote per building or for a portfolio, keep one point of contact and use the same report format, so actions can be compared across buildings.