Trench fill, strip, raft or piled foundations: which does your extension need?

The ground decides the foundation. On London Clay, trench fill is the usual answer, until trees or soft ground make it too deep.

By the Green Code Engineering team · Updated 24 November 2026

Deciding what to do? This guide explains the background. For short answers on what to do next and what it costs, see quick answers.

The short answer

Most London extensions on clay use trench fill foundations: a narrow trench filled with concrete almost to ground level, usually at least about 1 m deep and deeper near trees. Strip footings are a shallower traditional alternative on firmer ground. A raft suits soft or variable ground where loads need spreading. Piles take loads down to deep, stable ground and become economical when trench fill would need to go very deep, often around 2.5 to 3 m or more.

Side by side

Trench fillStripRaftPiled
How it worksTrench filled with concrete almost to the surfaceConcrete strip at the base, masonry up to groundReinforced slab spreading load over the whole footprintPiles to deep ground with a beam or slab on top
SuitsClay, most domestic extensionsFirm, non-shrinkable groundSoft or variable ground, light buildingsDeep clay near trees, heave risk, poor made ground
Typical depthAbout 1 m on clay, deeper near treesShallowerNear the surfaceMany metres
Watch out forDrains and services in the trench; tree heaveClay shrinkageDesign and reinforcement detailCost and rig access

What decides the choice

Four things: the soil and how shrinkable it is, nearby trees (including neighbours' and street trees), drains and sewers along the line of the foundation, and how soft or variable the ground is. On clay near trees, established depth guidance relates the required depth to the tree's species, height and distance. Where trees have been removed, the clay can swell, so the design may need compressible material against the foundation. See London Clay, trees and foundations.

Verdict

Trench fill for most clay sites. Strip on firm, non-shrinkable ground. Raft where ground is soft or variable and loads are light. Piles where trench fill would be very deep or heave is a risk. A trial pit or desk study early avoids redesigning in the trench.

Frequently asked questions

Can Building Control change my foundation depth on site?

Building Control inspects the excavation and can ask for it to go deeper if the ground isn't as expected, which is why the design should allow for what might be found.

What if a drain runs along the trench?

The foundation may need to go deeper, bridge over the drain or the drain may need diverting; Thames Water approval is needed near public sewers.

Do I need a ground investigation for a small extension?

Not always. A trial pit is often enough; a fuller investigation is worth it for soft ground, basements or new homes.

References

  • NHBC Standards, Chapter 4.2, Building near trees
  • Approved Document A (Structure), Building Regulations 2010
  • BS EN 1997 (Eurocode 7, geotechnical design)