Can I get a structural report before exchange?
Yes. Tell us your exchange date when you enquire and we confirm the visit and report dates in writing before you book.
The short answer
Yes. We can usually inspect within 48 hours of your enquiry and issue the report within 5 working days of the visit, with a faster service available for an extra fee. Tell us your exchange date and we confirm the dates in writing before you book. For one defect flagged by the survey or valuer, the usual report is a Specific Structural Inspection (SSI) from £450 + VAT.
Which report to book
Choose by what the survey or lender has flagged:
- One defect, such as a crack, a removed chimney breast or a knocked-through wall: Specific Structural Inspection report (SSI) (from £450 + VAT).
- Several concerns, or the surveyor recommends structural advice in general terms: General Structural Inspection report (GSI) (from £650 + VAT).
- Widespread movement, or you want a complete picture before buying: Full Structural Inspection report (FSI) (from £1,200 + VAT).
- A solicitor only needs written confirmation about one alteration: structural letter of comfort (from £300 + VAT).
Not sure? Send us the surveyor's wording and we will tell you which one fits. Our guide Which structural inspection report do I need? compares them.
How fast it can happen
- Reply to enquiries within 2 working hours.
- Inspection usually within 48 hours.
- Report within 5 working days of the visit.
- Faster service available for an extra fee, agreed in writing before you book.
The engineer needs access, which your conveyancer or the estate agent arranges with the seller. Booking as soon as the survey flags an issue gives the most room before exchange.
What to send us
- The property address and postcode
- The wording from the survey or valuation that mentions the issue
- Your exchange date, or the date the lender needs the report
- Whether the lender needs the report addressed to them
- Photos, if you have them
- The agent's or seller's contact details for access
What the report tells you
The report says what is causing the defect, whether it appears to be historic or ongoing, how significant it is and what should be done next. It is signed off by a chartered engineer (CEng MICE). It gives you evidence to proceed, renegotiate or walk away, and answers the same question your own buyer's lender may ask when you sell.
Read more in Do I need a structural report when buying a house?
Frequently asked questions
Can you do it the same week?
Often, yes. Inspections are usually within 48 hours of your enquiry and reports within 5 working days of the visit. If your exchange date is tighter, a faster service is available for an extra fee; tell us the date when you enquire and we confirm what is possible before you book.
Is a RICS Level 3 survey not enough?
A survey describes the whole building's condition and often recommends further investigation of structural items. A structural engineer's report answers that structural question directly: the cause, whether it is still moving and what needs doing.
Who arranges access?
Your conveyancer or the estate agent normally arranges access with the seller. Send us their details and we coordinate the visit.
References
- RICS Home Survey Standard (survey levels and their scope)
- BRE Digest 251, Assessment of damage in low-rise buildings